EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Bovine-RV14A
-
Listing for Category : interior finish
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (239)
Research
- (2)
-
Laser cut parts...
-
Oshkosh recap
Workshop
- (15)
-
Fuselage rotisserie
-
Finishing kit delivery
-
Mounting TV in workshop
-
Building another...
-
New workshop table
-
Vans Lightbox Kit
-
Woodworking building...
-
Finished casters on...
-
Finished assembly of...
-
Started assembly of...
-
Finished first...
-
Started assembling...
-
Continued cutting...
-
Started cutting wood...
-
Got a wing cart
Empennage
- (1)
-
Inventory of emp kit
Fuselage
- (2)
-
Finished fuselage...
-
Fuselage kit...
Firewall
Tail Feathers
- (41)
-
Replacing LCP in rudder
-
Drilling out the...
-
Cutting elevator...
-
Starting Elevator prep
-
Finishing last...
-
Beginning to rivet...
-
Riveting lower skin...
-
Riveting top skin of HS
-
Offset riveting the...
-
Nose ribs and HS...
-
Riveting nose ribs...
-
Priming the HS skins
-
Riveting the HS ribs...
-
Counter-sinking HS...
-
Counter-sinking the...
-
Finish dimpling HS skin
-
Starting dimpling of...
-
Dimpling h-stab ribs
-
Deburring H-stab ribs
-
Riveting the H-stab...
-
Priming H-stab spar
-
Drilling,...
-
Match drilling...
-
Match drilling first...
-
Cutting spar caps...
-
H-stab spar
-
Pausing rudder and...
-
Rudder counterweight...
-
Riveting together...
-
Back-riveting the...
-
Nutplates and...
-
Starting to assemble...
-
Priming rudder parts
-
Skinwork and...
-
Prepping internal...
-
Starting on the rudder
-
Skinning the...
-
Riveting together VS...
-
Vertical stab...
-
Vertical stab match...
-
Starting work on...
Wings
- (86)
-
Moving the wings to...
-
Prepping and priming...
-
Dimpling and priming...
-
Cutting wing skin...
-
Assembling the...
-
Right aileron gap...
-
Right flap gap seal...
-
Attaching gap seals...
-
Priming gap seals
-
Attach left OBLE and...
-
Attaching left OBLE
-
Right OBLE and fuel...
-
Joining OBLE to...
-
Final bracket and...
-
Rivet party to...
-
Starting to rivet...
-
Priming,...
-
Dimpling and scuffing
-
Dimpling the wing skins
-
Match drilling top...
-
Riveting the right...
-
Assembling the right...
-
Priming rear spar...
-
Countersinking and...
-
Rear spar doublers
-
Riveting the ribs to...
-
Assembling inboard...
-
Assembling rib brackets
-
Installing snap...
-
Priming the right...
-
Prepping wing ribs...
-
Prepping parts for...
-
Finish...
-
Nutplate riveting...
-
Nutplate prep for...
-
Cutting and drilling...
-
Stall warning...
-
Fixing reversed OBLE...
-
Assembling the stall...
-
Left OBLE fully riveted
-
Starting to rivet...
-
Priming the left...
-
Scuffed and dimpled...
-
Right OBLE done
-
Resuming riveting on...
-
Nutplates and...
-
Priming Right OBLE...
-
Dimpling right OBLE...
-
Drilling and...
-
Assembling left OBLE...
-
More dimpling and...
-
More leading-edge...
-
Preparing parts for...
-
J-channel stiffener...
-
Finished the upper...
-
Flush riveting the...
-
Safety wire and...
-
Aileron hinge...
-
More wing skin...
-
Skin riveting and...
-
Starting to rivet...
-
Dimpling outboard...
-
New rear spar...
-
Aileron hinge...
-
Dimpling wing-walk...
-
Finish riveting rear...
-
Aileron bellcrank...
-
More countersinking...
-
Countersinking...
-
Attaching nutplates...
-
Rear spar dimpling...
-
Match drilling...
-
Match drilling rear...
-
Starting on the left...
-
Finished riveting...
-
Riveting the ribs to...
-
Bushings, riveting,...
-
Drilling and Priming...
-
Left wing ribs clecoed
-
Finished wing rib...
-
Countersinking spar...
-
Spar nutplates and...
-
Replacement hinge...
-
Drilling holes in my...
-
Wing kit delivery...
Flaps
- (23)
-
Finishing right flap
-
Closing up nose of...
-
Right flap trailing...
-
Finishing riveting...
-
Riveting the nose...
-
Countersink inboard...
-
Finish riveting top...
-
Started riveting on...
-
More right flap...
-
Flush riveting right...
-
More riveting of...
-
Riveting stuff to...
-
Priming and riveting...
-
Dimpling right flap...
-
Countersinking the...
-
Dimpling and...
-
Drilling and...
-
Mock assembly of the...
-
Match drilling the...
-
Left flap ribs,...
-
Prepping left flap ribs
-
Flap hinge brackets
-
Wing kit inventory...
Ailerons
- (16)
-
Finishing the left...
-
Closing up left...
-
Finishing up right...
-
Untwisting and...
-
Preparing trailing...
-
Right aileron nose...
-
Continue riveting...
-
Flush riveting nose...
-
Back riveting the...
-
Primed right aileron...
-
Left aileron skin prep
-
Right aileron nose...
-
Drilling the left...
-
Riveting aileron...
-
Continue prepping...
-
Starting on the...
Fuel Tanks
- (40)
-
Installing fittings...
-
Finishing the right...
-
Closing up the right...
-
Countersinking the...
-
Closing up the left...
-
Install vent line...
-
Water leak testing...
-
J-channel, attach...
-
Last 3 full ribs in...
-
Two more ribs down...
-
Starting to rivet...
-
Bending fuel sender...
-
Riveting last rib of...
-
Bending vent lines...
-
Installing J-channel...
-
Final ribs of left...
-
More fuel tank riveting
-
Second rib added to...
-
Starting to rivet...
-
Riveting and sealing...
-
Making replacement...
-
Fuel drain flanges...
-
Stiffeners on right...
-
Installed lower...
-
Starting the fuel...
-
More alodine...
-
Installing fuel tank...
-
Plugging fuel tank...
-
Alodine of fuel tank...
-
Alodine treatment of...
-
Cleaning fuel tank...
-
Scuffing fuel tank...
-
Close quarters...
-
Dimpling the fuel...
-
Countersinking fuel...
-
Fuel tank...
-
Fuel tank dimpling work
-
Prepping fuel tank...
-
Prepping fuel tank...
-
Fluting the fuel...
Controls
- (7)
-
Autopilot pushrods...
-
Prime and wrap up...
-
Drilling pushrods...
-
More pushrod and...
-
Riveting and priming...
-
Cutting and drilling...
-
Assembling pushrod...
Avionics
Lighting
- (4)
-
Cutting the wingtip...
-
Adding mounts for...
-
FlyLEDs control...
-
Assembling FlyLEDs...
Instrument Panel
Landing Gear
Engine
- (1)
-
Engine and prop ordered
Propeller
- (1)
-
Propeller and...
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
Jeff Lawson
-
Project:
Vans - RV-14A
-
VIEW REPORTS
Total Hours:
601.5
Total Flight Time:
Start/Last Date:
Jan 28, 2022 - No Finish Date
Engine:
Lycoming YIO-390-EXP119 non-cert
Propeller:
Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:
Dynon Skyview
Friendly URL:
https://eaabuilderslog.org?s=Bovine-RV14A
Home or Last Project Picture
No Entries found
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.